Challenge
Making an Impact Without Closing Off the Space
hopping centres are designed around movement, visibility and architectural openness. Introducing a large-format digital display into an existing structure requires careful consideration of all three. At Mall of Africa, the challenge was to transform the Edgars lift shaft into a digital advertising opportunity without creating a solid visual barrier within the retail environment. The installation needed to deliver strong visual impact across multiple floors while maintaining the sense of openness surrounding the lift shaft. Its scale introduced additional complexity. At 6.5 metres wide and 9 metres high, the display required careful structural planning, engineering coordination and installation accuracy. With the project taking place within an operational shopping centre, safety requirements, site access and the necessary approvals also had to be managed. The challenge was to balance digital visibility with architectural integration, ensuring the technology complemented the space rather than overwhelming it.
